Propylene Glycol, USP
CAS 57-55-6 · Part MC-PGUSP · USP / Food grade
USP grade propylene glycol. The low-toxicity glycol, specified wherever incidental food or potable water contact is possible.
Specification
- CAS number
- 57-55-6
- Part number
- MC-PGUSP
- Grade
- USP / Food grade
- Physical form
- Liquid
- Assay / concentration
- 99.5% min
- Category
- Glycols & Inhibitors
- Also known as
- PG, propane-1, 2-diol, MPG, food grade glycol
USP and food grade propylene glycol at 99.5% minimum.
Typical uses
- Heat transfer fluid in food plants, breweries, and HVAC systems
- Freeze protection where ethylene glycol is prohibited
- Humectant and carrier in personal care and food
- Pharmaceutical excipient, at USP grade
- De-icing and anti-icing formulations
Propylene or ethylene
Ethylene glycol transfers heat somewhat better and costs less. Propylene glycol is far less toxic and is the required choice anywhere a leak could reach food, potable water, or people — which is most food plants, most breweries, and any HVAC loop in an occupied building.
Where the code or the customer specification allows either, the cost difference rarely justifies the risk. Where it does not allow either, the specification decides.
Inhibited or uninhibited
Glycol supplied plain will not protect a metal loop from corrosion. Inhibited grades carry a corrosion inhibitor package and a dye for leak detection. Tell us which your system needs — an uninhibited fill in a steel system is a slow, expensive mistake.
Documents
Available to account holders and sent the same business day. If you need documents routinely, ask us to attach them to your shipping paperwork automatically rather than requesting them one at a time.
Current revision, sixteen-section GHS format
Measured results for the lot you received
Read the sheet before the first use
Section 2 covers the hazards, Section 8 the protective equipment actually required, and Section 10 what this must not be stored next to. Storage incompatibility is the single most common cause of serious chemical incidents.
If your approval process needs something that is not here, one email gets it.
Certificates, insurance, registrations, safety data sheets, and completed supplier questionnaires. Standard documents go out the same business day.